您当前的位置:
首页 >
文章列表页 >
Optimized operation strategy of multi⁃type demand side resourcesin virtual power plant considering air conditioning load
更新时间:2026-03-05
    • Optimized operation strategy of multi⁃type demand side resourcesin virtual power plant considering air conditioning load

    • Vol. 22, Issue 1, (2020)
    • Published:2020

    移动端阅览

  • 吴宛潞, 韩 帅, 郭小璇, et al. Optimized operation strategy of multi⁃type demand side resourcesin virtual power plant considering air conditioning load[J]. 2020, 22(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on the accommodation of day⁃ahead high⁃penetration renewable energy based on the flexibility of the system
Studies on Bonding Mechanism of Dry process Binderless Fiberboard Part Ⅱ.FTIR Study of Binderless Fiberboard
定向结构板的应用定向结构板系列讲座之五
热风干燥槠、栲类木材工艺探索及其应用
刨花板坯输送钢带起褶原因与防治措施

Related Author

吕振邦
余接永
曹前进

Related Institution

国网江西省电力有限公司 上饶供电公司
0