您当前的位置:
首页 >
文章列表页 >
Study on temperature stress of secondary lining concrete of diversion tunnel based on finite ele ⁃ ment analysis
更新时间:2026-02-06
    • Study on temperature stress of secondary lining concrete of diversion tunnel based on finite ele ⁃ ment analysis

    • Vol. 0, Issue 6, (2025)
    • Online First:05 February 2026,

      Published:2025

    移动端阅览

  • 赵恒发. Study on temperature stress of secondary lining concrete of diversion tunnel based on finite ele ⁃ ment analysis[J]. 2025, 0(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

LI Yan-long Mudanjiang Hydropower Plant
左丰收
安翼
黄楠
綦中跃
周上梯
CHEN Xiaojiang
ZHANG Yang

Related Institution

牡丹江水力发电总厂
北京市密云水库管理处
PowerChina Huadong Engineering Co., Ltd
中国水利水电科学研究院
国网新源控股有限公司十三陵蓄能电厂
0