俞雷, 吴修锋, 吴时强, et al. A decision-making method for cascade reservoirs operation balancing competition between power generation and ecology#br#[J]. 2025, 0(5).
俞雷, 吴修锋, 吴时强, et al. A decision-making method for cascade reservoirs operation balancing competition between power generation and ecology#br#[J]. 2025, 0(5).DOI:
A decision-making method for cascade reservoirs operation balancing competition between power generation and ecology#br#
Most decision-making methods do not fully consider the competitive relationship among operation objectives of cascade reservoirs. To this end
this paper integrates the replacement ratio-a quantitative indicator for multi-objective competing relationships-with the TOPSIS method
and proposes an improved TOPSIS decision-making method which is further applied to the cascade reservoirs in the lower reach of Yalong river. Results show that the improved TOPSIS increases the decision-making efficiency of the operation schemes and effectively reflects the decision maker′s preference for each objective under different incoming water conditions
which can achieve greater power generation and ecological benefits. Therefore
the proposed TOPSIS method is reasonable and reliable
RENOFALT B M,JANSSON R,NILSSON C.Effects of hydropower generation and opportunities for environmental flow management in Swedish riverine ecosystems[J].Freshwater Biology,2010,55(1):49-67.
DEB K,JAIN H.An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box Constraints[J].IEEE Transactions on Evolutionary Computation,2014,18(4):577-601.
MEKONNEN M M,HOEKSTRA A Y.The blue water footprint of electricity from hydropower[J].Hydrology and Earth System Sciences,2012,16(1):179-187.
WHITE L J,LADSON A R.An index of stream condition: user′ manual[M].Department of Natural Resources and Environment,Australia,1997.