您当前的位置:
首页 >
文章列表页 >
Optimization Model and Application of Long-term Operations of Reservoir Group of Hydropower Station
更新时间:2026-01-22
    • Optimization Model and Application of Long-term Operations of Reservoir Group of Hydropower Station

    • Issue 1, Pages: 82-85(2008)
    • CLC: TV697.11
    • Published:2008

    移动端阅览

  • 伍宏中, 白以昕. Optimization Model and Application of Long-term Operations of Reservoir Group of Hydropower Station[J]. 2008, (1): 82-85. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

139

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Closure Temperature Field and Shape Optimization of Arch Dam Based on Genetic Algorithm
Study on Compensation Dispatching Ability of Reservoir Group in the Upper Reaches of Yihe River and Shuhe River
Study on the optimum decision laws of implicit stochastic optimal regulation of reservoir group
Optimization of short-term operation of a group of power stations in a power system
Power dispatching for the combined operation of the Three Gorges Hydropower Plant and the Gezhouba Hydropower Plant

Related Author

彭辉
刘德富
田斌
ZHANG Fengxiang
MA Ying
ZHAO Yanhong
ZHONG Ping’an
REN De ji and CHEN Yang bo

Related Institution

三峡大学土木水电学院
College of Hydrology and Water Resources,Hohai University
The Yi-Shu-Si River Basin Administration
  三峡大学 湖北宜昌443002  
Three Gorges University
0