您当前的位置:
首页 >
文章列表页 >
Study on Key Problems of Dynamic Operation Control on Flood Limited Level of Huanren Reservoir
更新时间:2026-01-22
    • Study on Key Problems of Dynamic Operation Control on Flood Limited Level of Huanren Reservoir

    • Issue 1, Pages: 22-24(2008)
    • CLC: TV697.21
    • Published:2008

    移动端阅览

  • 袁晶瑄, 李福威. Study on Key Problems of Dynamic Operation Control on Flood Limited Level of Huanren Reservoir[J]. 2008, (1): 22-24. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

211

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Fuzzy Inference Dynamic Control Method for Flood Limited Level
Studying on hydrological modeling and flood forecasting of Yishusi watershed
Review and perspective of reservoir flood limit level determination methods
Distinguishing method of wave filter and planning in the flood forecast model
Reservoir regulation automation system for the Ankang Hydropower Plant

Related Author

Zhou Huicheng1
Zhu Yongying1
Wang Bende1
Zhang Chunbo2
Jin Yingxue2
Yang Dian-liang2
Li Zhi-jia1
Li Zhi-long1

Related Institution

Biliuhe Reservoir Burean in Dalian
Dalian University of Technology
沂沭泗水利工程管理局
Yi Shu Si River Water Resources Bureau
0