您当前的位置:
首页 >
文章列表页 >
Optimal Regulation for Maximization of Peak-energy Capacity Benefits in Cascade Hydropower Stations
更新时间:2026-01-22
    • Optimal Regulation for Maximization of Peak-energy Capacity Benefits in Cascade Hydropower Stations

    • Issue 1, Pages: 74-76(2007)
    • CLC: TV737
    • Published:2007

    移动端阅览

  • 吴正佳, 周建中, 杨俊杰, et al. Optimal Regulation for Maximization of Peak-energy Capacity Benefits in Cascade Hydropower Stations[J]. 2007, (1): 74-76. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

549

下载量

43

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal flood dispatching model and its application study
Discussions on the reservoir generation dispatching optimal method considering the prices of peak and valley electricity
Study on the layered coupling model of real-time optimal operation for hydropower station under the market mechanism
On the water impoundment at the elevation of 139 m of the Three Gorges Reservoir
Construction and Application of Water Dispatching Automatic System in Chencun Hydropower Station

Related Author

唐九如
王俊阳
舒畅
康玲
梁斌
姜铁兵
OU Shu jun
LI Wei

Related Institution

柘溪水电站!湖南安化
Hydropower and Energy Research Institute of Huazhong Technology University)Wang Junyang and Tang Jiuru
Ningbo City Baixi Reservoir Construction Development Co.,Ltd.
河海大学水资源环境学院
College of Water Resources and Environment,Hohai University
0