您当前的位置:
首页 >
文章列表页 >
Construction and Technique Prospective on Super-high Concrete Face Rockfill Dams in China
更新时间:2026-01-22
    • Construction and Technique Prospective on Super-high Concrete Face Rockfill Dams in China

    • Issue 1, Pages: 64-68(2007)
    • CLC: TV641.43
    • Published:2007

    移动端阅览

  • 杨泽艳, 周建平. Construction and Technique Prospective on Super-high Concrete Face Rockfill Dams in China[J]. 2007, (1): 64-68. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

642

下载量

47

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design and Construction Concepts of High Concrete Facing Rockfill Dam
Construction of the concrete race rockfill dam of Xiaoshan Hydropower Station
A summary of the construction of Xiaoshan Hydropower Station
Development and experience of concrete face rockfill dam in China
Drainage in the body of the Sanxi concrete face rockfill dam during construction period

Related Author

Yuan Quan2
Li Liang2
Xu Jianhua2
Wang Yunqing2
Li Changcai1
Sun Yi1
范忠军
赵永科

Related Institution

Hubei Qingjiang Shuibuya Project Construction Co.
Hubei Qingjiang Hydropower Development Co.,Ltd.
Songjianghe Power Station Construction Agency, China Water Conservancy and Hydropower Engineering Bureau 1
Construction Bureau of Songjianghe Hydropower Station, China Water Conservancy and Hydropower Engineering Bureau 1
  100038  
0