您当前的位置:
首页 >
文章列表页 >
Design and Treatment on Asphaltic Concrete Facing of Upper Reservoir in Tianhuangping Pumped Storage Power Station
更新时间:2026-01-22
    • Design and Treatment on Asphaltic Concrete Facing of Upper Reservoir in Tianhuangping Pumped Storage Power Station

    • Issue 1, Pages: 37-39(2007)
    • CLC: TV861
    • Published:2007

    移动端阅览

  • 张春生, 张克钊. Design and Treatment on Asphaltic Concrete Facing of Upper Reservoir in Tianhuangping Pumped Storage Power Station[J]. 2007, (1): 37-39. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

99

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Construction of high water content earth filling in the upper reservoir dam of Tianhuangping Pumped storage Power Station
The general layout of Tianhuangping Pumped storage Power Station
The design of the upper reservoir of Tianhuangping Pumped-storage Power Plant
The feasibility study on canceling the Emptying/Spillway Tunnel for the Upper Reservoir of Tai′an Pumped Storage Power Station
Application of Self-compacted Rockfill Concrete in Baoquan Pumped-storage Power Station

Related Author

赵会明
Yan Zhizhen and Zhao Huiming
张春生
Sun Jiemin and Zhang Chunsheng
Wen Hong
Zhang Kezhao
LI Jinrong
郑新刚

Related Institution

China Water Conservancy and Hydropower Engineering Bureau 5
East China Investigation and Design Institute
East China Investigation and Design Institute
China Water Resources and Hydropower Engineering Consulting Corporation
  中国水利水电建设工程咨询公司 北京100011  
0