您当前的位置:
首页 >
文章列表页 >
Acceptance test of turbine model for Pubugou Hydropower Station
更新时间:2026-01-21
    • Acceptance test of turbine model for Pubugou Hydropower Station

    • Issue 1, Pages: 40-43+64(2006)
    • CLC: TV734.2
    • Published:2006

    移动端阅览

  • 胡卫, 向升, 郑正勤, et al. Acceptance test of turbine model for Pubugou Hydropower Station[J]. 2006, (1): 40-43+64. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

141

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Hydraulic Research and Model Test of Pump Turbine with Splitter Blade at Qing Yuan pumped storage Hydropower Station

Related Author

DU Rong-xing
CHEN Liang-nian
TAKEO Tokumiya
WANG Qing
ENOMOTO Yasuyuki

Related Institution

Toshiba Hydro Power(Hangzhou) Co.,Ltd
Toshiba Corporation
0