As entering into the high water cut stage of the oilfield
the electric submersible pump has been widely applied because of large capacity
simple ground equipment and downhole energy transfer mode. It is very important to grasp the well working condition of ESP
excavate the potential of oil well productivity
ensure effective operation of equipment and improve the systemic efficiency. The systemic efficiency optimization design of ESP Well in this paper is based on the supply capacity of formation
and also the coordination between formation and lifting equipment of ESP.