您当前的位置:
首页 >
文章列表页 >
Process Planning of Flue Gas Waste Heat Recovery System in Converter
更新时间:2026-01-19
    • Process Planning of Flue Gas Waste Heat Recovery System in Converter

    • Issue 1, Pages: 81-83+102(2014)
    • CLC: TK229.929
    • Published:2014

    移动端阅览

  • 江文豪, 姚群. Process Planning of Flue Gas Waste Heat Recovery System in Converter[J]. 2014, (1): 81-83+102. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

184

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Practical Application of Improving P Removal Rate of 120 t Converter
Practice of Reducing Tapping Temperature of Converter in Fangda Special Steel
Design of Waste Heat Incinerator for 250 t/d Mechanical Grate Incinerator
Waste Heat Utilization of Sintering Cooling Machine
62 t/h CDQ Waste Heat Boiler Thermodynamic Test

Related Author

黄乐
王金生
吴湧涛
熊小明
王小平
焦志武
甘久明
焦志武

Related Institution

阳春新钢铁有限责任公司
方大特钢科技股份有限公司
江联重工集团股份有限公司
河北省节能监察监测中心
江西江联能源环保股份有限公司
0