According to logic problems due to the imperfect in DCS and its processes during the on-site commissioning process and after into the formal commercial operation of the 2×660 MW supercritical generating units in Jingdezhen Power Plant of China Power Investment Corporation Jiangxi Branch
and also in accordance with the plant’s actual situation
the improvement measures are advanced and its implement effects are elaborated
wanting to have some reference in the debugging and production of the similar units.
Optimization Analysis of Feedwater Pump Configuration of 1 000 MW Class Thermal Power Unit
Influence of Trip Time and Logic Sequence of High Pressure Fluidized Fan on CFB Boiler Operation——Discuss on Choked Problems of Material Return Valve in CFB Boiler
Research and Application of FSSS on The Simulator for 600MW Power Unit