Implement equipment operation and meticulous management
strengthen the process control
strengthen the technical supervision to eliminate equipment problems
carefully manage and optimize the implementation of the standard training of Xinchang Power Generation Co.
Ltd.were described.As of September 30
2011
655 days safe operation of the whole plant and 445 days network running of unit #2 were achieved.A national record of continuous operation of ultra-supercritical unit was realized.