熊玉辉. Study on Induced Voltage of the Cross-cable——1×330MW CFB Unit Expansion Project of Jiangxi Fenyi Electric Power Plant as an Example[J]. 2011, (4): 84-86.
熊玉辉. Study on Induced Voltage of the Cross-cable——1×330MW CFB Unit Expansion Project of Jiangxi Fenyi Electric Power Plant as an Example[J]. 2011, (4): 84-86.DOI:
Study on Induced Voltage of the Cross-cable——1×330MW CFB Unit Expansion Project of Jiangxi Fenyi Electric Power Plant as an Example
摘要
重点阐述电缆交叉布置的感应电压是如何产生的
同时以国内首台江西分宜电厂1×330MWCFB机组扩建工程为例
简明扼要的叙述了继电器的动作原理。结合工程实际分析了电缆敷设时如何合理敷设控制电缆与动力电缆
避免二者交叉布置产生感应电压。
Abstract
The induced voltage of the cross-cable is how to generate is expatiated in this paper. At the same time
the operation principle of relay is narrated concisely
taking the first domestic 1×330MW CFB unit expansion project of Jiangxi Fenyi Electric Power Plant as an example. Combing the engineering practice of cable laying
the reasonable control cable and power cable laying are introduced as to avoid induced voltage generation of the cross-cable.