with double-in-double-out ball pulverizing mill and positive-pressure direct-fired pulverizing system
has exploded many times since it is put into operation
imperiling to the safety and stability of the boiler. The main causes are that coal dust fired in the corner of ball mill or in the cone of separator and PC-pipe leaks coal dust. According to the analysis
several operation control keynotes in pulverizing system are presented and configuration of the pulverizing system is changed.