which is the most important part in I&C installation work of thermal power plant
is not only complicated but also precision.The principle of kinds of measuring probe was analyzed
and elementary diagram and site installation drawing were compared for better understanding.The detail problems of TSI installation were described systematically
at the same time the problem occurred during the commissioning of the unit were analyzed and treatment measures were proposed.It is of certain significance to turbine proper of I&C installation in plant.