吕玉龙. Existing Problem and Solving Method of Mine Shearer in Production Process[J]. 2007, (3): 48-49.DOI:
Existing Problem and Solving Method of Mine Shearer in Production Process
摘要
简单分析煤矿井下采煤机在采煤过程中易出现的障与问题
并提出了解决办法。其次是对采煤机几个重要部位做好日常检修工作
以切实保障运行时不出现故障。
Abstract
This paper briefly analyzed breakdowns and problems of mine shearer when it is working.Then it gives the solution that routine maintenance should focus on several important parts.