The Qi Dong county coal mine had been exploited for coal seam group in which the combination layout of district roadways had been adopted.So existence had always been lifted up and the coal seam phenomenon appeared in rock alley construction process.A coal seam by the passive shoring of U29 type shed stiffness to be under construction is not only with lower construction progress 、higher shoring cost but also higher tunnel pressure 、stress concentration and difficult shoring.Sometimes it causes the situation of frequently revision which brings severe threat to safety production.According to this problem
this paper illustrated bolt support technology feasibility study on the coal seam gateway.
Practical Application of Dust Pollution Monitoring and Intelligent Soot Blowing System on Heating Surface of 660 MW Boiler
Application of Comprehensive Analysis and Evaluation Method in Treatment of Volatile Organic Compounds——Take an Industrial Park in Jiangxi Province as an Example
Application of Electric Integrated Automation System in Power Plant
Research and Application of Tibet(High Atitude) PV Power Station
Application of Circulating Fluidized Bed Boiler in Agricultural and Forestry Biomass Power Generation Project