葛乃友. The Use of Drum-type Cinder Cooling Machine Cooled by Wind and Water in Power Plant of Burning Coal[J]. 2006, (4).DOI:
The Use of Drum-type Cinder Cooling Machine Cooled by Wind and Water in Power Plant of Burning Coal
摘要
本文介绍芦岭阳光能源综合利用有限公司煤矸石发电厂原锅炉人工间断排渣方式的缺陷
浅析风水冷却滚筒式冷渣机干式排渣方式的优点。
Abstract
The shortcomings of the method of removing boiler cinder discontinuously by manual labor in power plant of burning coal gangue was introduced and the advantages of the method of cleaning cinder by drum-type cinder cooling machine cooled by wind and water was analyzed.