您当前的位置:
首页 >
文章列表页 >
Medium- and Long-term Contract Electricity Decomposition Strategy for Cascade Hydropower Stations Responding to Load Standards
更新时间:2026-01-13
    • Medium- and Long-term Contract Electricity Decomposition Strategy for Cascade Hydropower Stations Responding to Load Standards

    • In the field of electricity market, experts have proposed a method for decomposing medium and long-term contract electricity, which effectively guides the allocation of electricity for cascade hydropower stations, improves revenue and social welfare.
    • PEARL RIVER   Pages: 1-14(2026)
    • Received:23 September 2025

      Revised:2025-12-11

      Accepted:22 December 2025

      Published Online:13 January 2026

    移动端阅览

  • QING Jiu,CAI Wangwei,LIU Hongbo.Medium- and Long-term Contract Electricity Decomposition Strategy for Cascade Hydropower Stations Responding to Load Standards[J].PEARL RIVER, DOI:10.3969/j.issn.1001-9235...001.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of Power Generation Potential of Kaidu River Cascade Hydropower Stations Based on Simulation-Optimization Dispatching Framework
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy

Related Author

CHEN Hongbo
BAI Tao
HUA Xin
LIU Rui
KANG Yu
HUA Xin
LIU Rui
KANG Yu

Related Institution

CHN Energy Xinjiang Kaidu River Valley Hydropower Development Co., Ltd, Korla
State Key Laboratory of Eco-Hydraulics in Northwest Arid Region of China, Xi'an University of Technology
Electric Power Dispatching and Control Center,China Southern Power Grid Company Limited
Institute of Hydropower and Hydroinformatics,Dalian University of Technology
0