Research on Ground Treatment and Settlement Observation of Confined Water Foundation for Transmission Line in Mountainous Area
|更新时间:2026-02-13
|
Research on Ground Treatment and Settlement Observation of Confined Water Foundation for Transmission Line in Mountainous Area
Vol. 45, Issue 4, Pages: 44-50(2022)
作者机构:
中国电力工程顾问集团西南电力设计院有限公司
作者简介:
基金信息:
DOI:
CLC:TM753
Published:2022
稿件说明:
移动端阅览
GU Liangyu. Research on Ground Treatment and Settlement Observation of Confined Water Foundation for Transmission Line in Mountainous Area[J]. 2022, 45(4): 44-50.
DOI:
GU Liangyu. Research on Ground Treatment and Settlement Observation of Confined Water Foundation for Transmission Line in Mountainous Area[J]. 2022, 45(4): 44-50.DOI:
Research on Ground Treatment and Settlement Observation of Confined Water Foundation for Transmission Line in Mountainous Area
the countermeasures for confined water foundation of transmission lines in mountainous areas are limited
and once the problems such as foundation deflection and settlement occur
it is very difficult to deal with
and even will affect the safe operation of transmission lines. Combined with an engineering example
the deflection and settlement problem of straight-column big-plate foundation for confined water foundation of transmission line in mountainousarea is analyzed and renovated through numerical simulation
and the treatment effect is verified by two years of long-term continuous observation data. The verification results show that the proposed treatment method is effective and reliable
which can provide a guidance for engineering practice.