Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area
|更新时间:2026-02-13
|
Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area
Vol. 45, Issue 4, Pages: 1-6(2022)
作者机构:
国网四川省电力公司
作者简介:
基金信息:
DOI:
CLC:TM612
Published:2022
稿件说明:
移动端阅览
XU Tao. Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area[J]. 2022, 45(4): 1-6.
DOI:
XU Tao. Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area[J]. 2022, 45(4): 1-6.DOI:
Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area
with the rapid increase of the number and installed capacity of hydropower stations in Sichuan
the impact of simultaneous shutdown and peak averting measures of the centralized large-scale hydropower generator group on the safe operation of power grid has become increasingly prominent. Combined with the actual situation of hydropower station operation
hydropower dispatching management and power grid operation in Sichuan
it is defined that the main factors causing shutdown and peak averting in hydropower station are flow
sediment and impurities
and the impact of shutdown and peak averting of the centralized largescale run-of-river hydropower stations on power grid dispatching is analyzed. The distribution characteristics of shutdown and peak averting is studied from two dimensions of time and space (watershed)
and the flow and water quality are proposed as a feasible judgment method to predict whether the hydropower station will shut down and avoid peak load. Finally
the design idea for shutdown and peak averting management system of the centralized large-scale hydropower generator group is introduced from the aspects of prediction method
real-time monitoring and system architecture. The practical application of the management system in Sichuan power grid shows that the proposed system can improve the organization ability of power grid dispatching to control the real-time shutdown and peak averting
help to assist the safe and stable operation of power grid in flood season
and provide a reference for the shutdown and peak averting management of the regional power grid and hydropower plants.
Analysis of Shutdown and Peak Averting Characteristics and Design of Management System for Centralized Large-scale Hydropower Generator Group in Sichuan Area