In view of large power shortage in winter in Hetian power grid
the measures to improve the voltage recovery ability is proposed by using SVG after the fault happening in Hetian area
so as to improve the power transmission ability of relevant section and meet the regional power demand. A comprehensive analysis and comparison are carried out mainly from the different installation locations and installation capacities of SVG in power grid
and a scientific and reasonable SVG configuration scheme is given to effectively improve the voltage support capacity of power grid
thereby improving the receiving capacity of power grid
ensuring the safe and stable operation of power grid and meeting the needs of economic and social development.