Analysis on Protection Reform Method in 110 kV Substation
|更新时间:2026-02-13
|
Analysis on Protection Reform Method in 110 kV Substation
Vol. 43, Issue 5, Pages: 37-42(2020)
作者机构:
国网杭州供电公司
作者简介:
基金信息:
DOI:
CLC:TM755
Published:2020
稿件说明:
移动端阅览
Huo Dan. Analysis on Protection Reform Method in 110 kV Substation[J]. 2020, 43(5): 37-42.
DOI:
Huo Dan. Analysis on Protection Reform Method in 110 kV Substation[J]. 2020, 43(5): 37-42.DOI:
Analysis on Protection Reform Method in 110 kV Substation
摘要
总结了110 k V超期运行变电站保护改造过程中有限停电条件下保护改造作业时安全措施、改造方法、调试手段和注意事项
并进一步比较了几种改造方案的时间成本和人力成本
推导出最优改造方案
为国内的110 k V变电站整站保护改造提供参考。
Abstract
The security measures
reformation method and commissioning method are summarized as well as the matters needing attention in 110 kV substation with extra service during the protection reformation in a few power rationing condition. The time cost and labor cost of several protection reformation plans are compared
and the optimal plan is deduced
which provides a reference for protection reformation in 110 kV substation in China.