四川华能宝兴河水电有限责任公司
Published:2020
移动端阅览
Liu Jiangtao. Reserch on AGC of Joint Scheduling with Cascade Hydropower Stations[J]. 2020, 43(4): 28-32.
DOI:
Liu Jiangtao. Reserch on AGC of Joint Scheduling with Cascade Hydropower Stations[J]. 2020, 43(4): 28-32. DOI:
以宝兴河梯级开发为背景
基于梯级水电站联合调度AGC系统
阐述了如何根据机组水头、区间流量、生态流量变化实现梯级水电站联合调度AGC
并提出了相应的计算机监控系统的程序设计方案。开展了厂站、集控、省调三方联调试验
提高了水能利用效率。
Based on the cascade development of Baoxing river and AGC system of joint scheduling of cascade hydropower stations
how to realize the AGC of joint scheduling of cascade hydropower stations is described according to the variation of unit head
interval flow and ecological flow
and the corresponding programming scheme for computer monitoring system is proposed. The joint scheduling test of plant station
centralized control center and provincial dispatching center is carried out
which improves the water utilization.
0
Views
下载量
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution