您当前的位置:
首页 >
文章列表页 >
Reducing Trip - out Rate of 10 kV Overhead Line by Application of Arrester with Gaps
更新时间:2026-02-13
    • Reducing Trip - out Rate of 10 kV Overhead Line by Application of Arrester with Gaps

    • Vol. 42, Issue 1, Pages: 72-74(2019)
    • CLC: TM862
    • Published:2019

    移动端阅览

  • Liu Qizhong. Reducing Trip - out Rate of 10 kV Overhead Line by Application of Arrester with Gaps[J]. 2019, 42(1): 72-74. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reducing Trip - out Rate of 10 kV Overhead Line by Application of Arrester with Gaps
Study on Fault Characteristics of Hybrid Transmission Line with GIL and Overhead Line
Research and Analysis on Self-ring Inter-connection Mode for 10 kV Overhead Line of Beijing Distribution Network
Study on Fault Characteristics of Hybrid Transmission Line with GIL and Overhead Line

Related Author

Li Haoyuan
Liu Baoquan

Related Institution

Central Southern China Electric Power Design Institute Co.,Ltd. of China Power Engineering Consulting Grou
Yizhuang Power Supply Company of State Grid Beijing Electric Power Company
0