您当前的位置:
首页 >
文章列表页 >
Research on Mid - long Term Dispatching Model of Hydropower Based on Minimization of Power Generation Deviation Under New Situation of Electricity System Reform
更新时间:2026-02-13
    • Research on Mid - long Term Dispatching Model of Hydropower Based on Minimization of Power Generation Deviation Under New Situation of Electricity System Reform

    • Vol. 42, Issue 1, Pages: 37-40(2019)
    • CLC: TM73
    • Published:2019

    移动端阅览

  • Bai Zhidan. Research on Mid - long Term Dispatching Model of Hydropower Based on Minimization of Power Generation Deviation Under New Situation of Electricity System Reform[J]. 2019, 42(1): 37-40. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Mid - long Term Dispatching Model of Hydropower Based on Minimization of Power Generation Deviation Under New Situation of Electricity System Reform
Short-term Optimal Scheduling Method for Combined Operation of Wind power and Hydropower Considering Uncertainty of Wind Power
An Optimal Head Selection Method for MILP Moder of Hydropower Plant Based on Operation Data
Short-term Optimal Scheduling Method for Combined Operation of Wind power and Hydropower Considering Uncertainty of Wind Power
An Optimal Head Selection Method for MILP Moder of Hydropower Plant Based on Operation Data

Related Author

Miao Shumin
Wang Liang

Related Institution

国网四川省电力公司电力科学研究院
State Grid Sichuan Electric Power Research Institute
0