您当前的位置:
首页 >
文章列表页 >
适应新型电力系统的灵活性水电建设研究
更新时间:2025-11-11
    • 适应新型电力系统的灵活性水电建设研究

    • Vol. 51, Issue 11, Pages: 7-11(2025)
    • CLC: TM73;TV737
    • Published:2025

    移动端阅览

  • 宗万波, 殷晶, 陈旭云. 适应新型电力系统的灵活性水电建设研究[J]. 2025, 51(11): 7-11. DOI:

  •  
  •  

0

Views

231

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Construction and Operation of Pumped-storage Power Plant in Foreign Countries
Construction and management of Dabancheng Wind Power Plant in Xinjiang
十三陵蓄能电厂机组不能长时间调相问题分析及改造
New progress made in construction of large works of hydropower station
Improvements for the auxiliary equipment such as oil,water and compression air systems of Ertan Hydropower station

Related Author

Xia Songyu
Wang Wenqi
高占杰
Zhou Jian-ping2
Zhang You-tian1
Zang Gan-lin
Chen Yuan-lin
段忠民

Related Institution

Guangdong Joint Venture Company for Pumped-storage Power Plant
Wind Power General Plant of Xinjiang Power Industry Bureau
十三陵蓄能电厂
  北京100011  
China Hydropower Engineering Consulting Group Co.
0