您当前的位置:
首页 >
文章列表页 >
Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler
更新时间:2025-09-28
    • Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler

    • Thermal Power Generation   Issue 6, (2016)
    • CLC: TK223.3+1
    • Published Online:15 July 2016,

      Published:2016

    移动端阅览

  • ZHOU Ke, SHE Yuanyuan, LU Fen, et al. Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler[J]. Thermal power generation, 2016, (6). DOI:

  •  
  •  

0

Views

391

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influencing factors of reducing gas in water wall area of a 600 MW unit boiler
CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL OF 1025 t/h BOILER AND SOLVING MEASURES THEREOF
High-temperature Corrosion of Water wall Tubes in a Supercritical Boiler : cause analysis and countermeasures
Cause analysis and countermeasures of high-temperature sulfur corrosion of water wall in an opposed firing boiler
Fouling monitoring and intelligent sootblowing control technologies for coal-fired boilers

Related Author

XUE Xiaolei
YU Shengjie
CHEN Min
WANG Xiaohua
LI Gang1
LI Xixiao1
WEI Tongsheng2
XU Dangqi2

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.,Suzhou Branch
Huaneng Jinan Huangtai Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Fujian Energy Group Hongshan Thermal Power Co., Ltd
College of Energy, Power and Mechanical Engineering, North China Electric Power University
0