Stress Characteristics of Ultra-Long Irregular Concrete Gate Warehouses during Construction
|更新时间:2025-09-25
|
Stress Characteristics of Ultra-Long Irregular Concrete Gate Warehouses during Construction
“In the field of crack prevention in ultra long concrete structures, experts have used finite element method simulation calculation to propose the optimal temperature control index for winter pouring, providing a solution to reduce construction difficulty.”
PEARL RIVERPages: 1-14(2025)
作者机构:
1.中铁水利水电规划设计集团有限公司,江西省水工结构工程技术中心,江西 南昌 330029
2.河海大学水利水电学院,江苏 南京 210098
作者简介:
基金信息:
DOI:
CLC:
Revised:2025-08-31,
Accepted:01 September 2025,
Published Online:25 September 2025,
稿件说明:
移动端阅览
张建华,胡荣金,赵云鹏等.超长异形混凝土门库结构施工期应力特点研究[J].人民珠江.
ZHANG Jianhua,HU Rongjin,ZHAO Yunpeng,et al.Stress Characteristics of Ultra-Long Irregular Concrete Gate Warehouses during Construction[J].PEARL RIVER.
张建华,胡荣金,赵云鹏等.超长异形混凝土门库结构施工期应力特点研究[J].人民珠江.DOI:
ZHANG Jianhua,HU Rongjin,ZHAO Yunpeng,et al.Stress Characteristics of Ultra-Long Irregular Concrete Gate Warehouses during Construction[J].PEARL RIVER.DOI:
Stress Characteristics of Ultra-Long Irregular Concrete Gate Warehouses during Construction