Meng Li,Hongliang Yu,Ping Liu.An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM[J].Automation in Construction,2018.
Simulation analysis of high arch dam considering closure grouting during construction period
高拱坝分期施工和分期蓄水仿真计算软件研制
人工深水湖渗流场及防渗方案三维仿真模拟研究
基于监测数据的重力坝施工期-蓄水期-运行期工作性态仿真分析
Related Author
Han Xiao-feng1 Zhang Wei2 1.Guangxi Electric Power Industry Investigation Design and Research Institute Nanning Guangxi 530023 2.State Key Laboratory of Water Resources and Hydropower Engineering Science Wuhan University Wuhan Hubei 430072)