QIN Haojun, WANG Lijie, PU Guoqing, et al. Study on deformation characteristics of high core rockfill dam after impoundment based on inversion parameters#br#[J]. 2025, 0(1).
QIN Haojun, WANG Lijie, PU Guoqing, et al. Study on deformation characteristics of high core rockfill dam after impoundment based on inversion parameters#br#[J]. 2025, 0(1).DOI:
Study on deformation characteristics of high core rockfill dam after impoundment based on inversion parameters#br#
accurate and reliable mechanical parameters of dam material are the important basis for dam deformation prediction and dam safety evaluation. Based on the monitored deformation data of Luding core wall rockfill dam
the rheological parameters of rockfill and core wall materials are inversed in this paper. Combined with the actual filling and impoundment process of the dam
the numerical simulation is carried out
and the stress
deformation and differential settlement of the dam after completion and impoundment are analyzed. The results show that the obtained stress and deformation of the dam based on the inversed parameters are in good agreement with the actual situation
and the settlement and principal stress of the dam at the completion and during the impoundment period are within the allowable range. At the completion
the deformation inclination of the dam crest is less than 1%. During the impoundment period
the deformation inclination of the dam crest area increases due to the wetting deformation of the upstream rockfill material. Moreover
the deformation inclination of the dam crest axis is larger than that of the upstream and downstream sides
and the deformation inclination of the dam crest at the middle of the valley is the largest
but it does not exceed 3%
that means there would be no longitudinal cracks
which is consistent with the actual situation. The research results can well predict the stress
deformation and crack of the dam body
which provides important support for dam safety evaluation.
关键词
Keywords
references
Ma H Q,Chi F D.Major Technologies for Safe Construction of High Earth- Rockfill Dams[J].Engineering,2016,2(4): 498-509.