The deformable body of Guobu slope is on the right bank of Laxiwa hydropower station
0.9~1.7 km upstream the dam. It is an ultra-large granitic rock slope with a volume of 102 million m 3
affected by various deformation mechanism
mainly toppling deformation
and is classified as Class B Grade I. After the reservoir impoundment in March 2009
obvious deformation of Guobu slope is observed. Hence
scientific research
safety monitoring and risk control measures are carried out
including geological exploration
deformation monitoring
numerical calculations using various methods
and stability analysis. Due to the high deformation rate of Guobu slope in the early stage of reservoir impoundment
the deformable body of Guobu slope was assessed as a major hazard of Grade Ⅱ. In 2018
based on study results
Guobu slope was reclassified as a safety risk of Grade Ⅱ (acceptable risk of Grade Ⅱ). In October 2015
the reservoir water level reached the normal impoundment level of 2 452 m. Long-term monitoring data since then show that the deformation of Guobu slope has slowed down after the reservoir water level stabilized between 2 450 m and 2 452 m. The daily deformation rate by the monitoring point at the maximum deformation decreased to less than 2 mm/d. Currently
the deformable body of Guobu slope is generally stable
and the risk is controllable. This paper introduces the specific measures and achievements in the treatment of the deformable body of Guobu slope of Laxiwa hydropower station