Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
更新时间:2025-09-28
    • Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately

    • Thermal Power Generation   Issue 6, (2017)
    • CLC: TK262
    • Published Online:30 June 2017,

      Published:2017

    移动端阅览

  • FU Yiwei, XIE Tian, QU Jie. Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately[J]. Thermal power generation, 2017, (6). DOI:

  •  
  •  

0

Views

894

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Overall economical performance of 1 000 MW class ultra-supercritical unit with double-reheat cycle
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Analysis on energy saving potentials of overheat recovery of steam extractions for double-reheat power unit
Evaluation methods for turbine steam seal retrofitting
Development and expectation of application of ultra-supercritical double-reheat steam turbines

Related Author

YAO Xiaolin
FU Chang
SHI Yanzhou
MENG Guixiang
WANG Anqing
WU Tao
CHU Mo
MA Pengbo

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
Xi'an Thermal Power Research Institute Co.,Ltd.
Dongfang Turbine Co., Ltd.
0