Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit
更新时间:2025-09-28
    • Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit

    • Thermal Power Generation   Issue 7, (2017)
    • CLC: TK229.2
    • Published Online:02 August 2017,

      Published:2017

    移动端阅览

  • GAO Jinghui, WANG Lin, YANG Bo, et al. Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit[J]. Thermal power generation, 2017, (7). DOI:

  •  
  •  

0

Views

393

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization and reconstruction of superheater and reheater for a 1 000 MW tower type boiler with double-reheat cycle
Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
Experimental study on optimization and adjustment of wall temperature of reheater tubes in an ultra supercritical double-reheat boiler
APPLICATION OF T23 STEEL IN LARGE-SCALE COVENTIONAL UTILITY BOIlERS
Measurement and analysis of tube wall temperature for heating surface of an ultra-supercritical 1 000MW unit boiler

Related Author

LIU Chao
LIU Hui
LI Ying
ZHANG Junjie
DONG Kun
WANG Xiaohua
MEI Zhenfeng
CHEN Min

Related Institution

Shenhua Guohua Electric Power Research Institute Company Limitied
Xi’an Thermal Power Research Institute Co., Ltd., Suzhou Branch
Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Hubei Wuhan 430070, Hubei Wuhan 430070, Hubei Wuhan 430070
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Yuhuan Power Plant
0