    • Design scheme and application of APS system in an ultra-supercritical 1 000 MW unit with double-reheat cycle

    • Thermal Power Generation   Issue 1, (2017)
    • CLC: TK323
    • Published Online:24 January 2017

      Published:2017

    移动端阅览

  • NIU Haiming, WU Dongli, YANG Shuang, et al. Design scheme and application of APS system in an ultra-supercritical 1 000 MW unit with double-reheat cycle[J]. Thermal power generation, 2017, (1). DOI:

  •  
  •  

0

Views

516

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Computational analysis on hydrodynamic characteristics and flow instability of an ultra supercritical 1 000 MW double-reheat unit boiler
Research on coupling calculation method of combustion and hydrodynamics for water walls in ultra-supercritical double-reheat boilers
Development and expectation of application of ultra-supercritical double-reheat steam turbines

Related Author

MAO Yijun
HE Lijun
ZHANG Yifan
YANG Yu
BAI Wengang
WU Tao
CHU Mo
MA Pengbo

Related Institution

Huaneng Anyuan Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
State Key Laboratory of Efficient and Clean Coal-fired Utility Boilers, Harbin Boiler Company Limited
0