Key points analysis and control for start-up process of a 1 000 MW double-reheat unit
更新时间:2025-09-28
    • Key points analysis and control for start-up process of a 1 000 MW double-reheat unit

    • Thermal Power Generation   Issue 7, (2017)
    • CLC: TK267
    • Published Online:02 August 2017,

      Published:2017

    移动端阅览

  • LIAO Junlin, SONG Xiaohui, WANG Tao, et al. Key points analysis and control for start-up process of a 1 000 MW double-reheat unit[J]. Thermal power generation, 2017, (7). DOI:

  •  
  •  

0

Views

415

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Development and application of high precision multi-function simulation system for ultra supercritical double-reheat units
Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Optimization and reconstruction of superheater and reheater for a 1 000 MW tower type boiler with double-reheat cycle
Study on thermal performance of double-turbine regeneration system in double-reheat unit

Related Author

CAI Baoling
GAO Haidong
CAO Jun
ZHOU Dongyang
ZHENG Xiaogang
GU Zhengmeng
WU Hengyun
MAO Yijun

Related Institution

Huaneng Anyuan Power Generation Co., Ltd.
Guodian Taizhou Power Generation Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
Shenhua Guohua (Beijing) Power Research Institute Co., Ltd.
Huaneng Anyuan Generation Co., Ltd.
0