您当前的位置:
首页 >
文章列表页 >
Function analysis for automatic depressurization system in AP1000 nuclear power plant
更新时间:2025-09-28
    • Function analysis for automatic depressurization system in AP1000 nuclear power plant

    • Thermal Power Generation   Issue 4, (2016)
    • CLC: TL364+.4
    • Published Online:15 May 2016,

      Published:2016

    移动端阅览

  • HUANG Xiong, La Xuefeng, LI Yilin, et al. Function analysis for automatic depressurization system in AP1000 nuclear power plant[J]. Thermal power generation, 2016, (4). DOI:

  •  
  •  

0

Views

251

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental study on steam temperature enhancement for an in-service subcritical unit
Resistance in hot secondary air duct in a 1 000 MW unit boiler manufactured in Dongfang Boiler Group
Heat transfer and resistance characteristics of pipes in boiler based on coupled physical field
Failure analysis and improvement for containment spray system valve's remote actuating mechanism in a nuclear power station
ANALYSIS OF MAIN STEAM CONDUIT VIBRATION OF 35MW STEAM TURBINE AND REMEDIAL MEASURES THEREOF

Related Author

ZHU Haiyi
RAN Shenming
HU Hao
LI Haibin
GUO Shifan
QIAN Gejin
SHEN Jianxun
ZHOU Rongcan

Related Institution

Harbin Turbine Company Limited
Dongfang Boiler Group Co., Ltd.
Central Southern China Electric Power Design Institute
Huaneng Yueyang Power Plant
Huaneng Power International, Inc.
0