您当前的位置:
首页 >
文章列表页 >
Failure analysis of flange used for urea hydrolysis equipment
更新时间:2025-09-28
    • Failure analysis of flange used for urea hydrolysis equipment

    • Thermal Power Generation   Issue 5, (2016)
    • CLC: TG172.82
    • Published Online:15 June 2016,

      Published:2016

    移动端阅览

  • HUANG Jinyang, YANG Zheng, LU Jintao, et al. Failure analysis of flange used for urea hydrolysis equipment[J]. Thermal power generation, 2016, (5). DOI:

  •  
  •  

0

Views

363

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Problem analysis for transportation of urea hydrolysis production gas for thermal power plants
Model for predicting SCR flue gas denitration efficiency based on particle swarm optimization and twin support vector machine
Design of flue gas denitration control system based on feedforward constrained dynamic matrix control

Related Author

ZHANG Bo
ZHANG Xiangyu
LI Minghao
TIAN Wenchao
XU Hongjie
NIU Guoping
CHANG Lei
JIA Linquan

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
School of Information Science and Technology, Zhejiang Sci-Tech University
Focused Photonics (Hangzhou) Inc.
Xi’an Thermal Power Research Institute Co., Ltd.
Department of Automation, North China Electric Power University
0