您当前的位置:
首页 >
文章列表页 >
Fuel fast cutting plan for thermal power unit during FCB process
更新时间:2025-09-28
    • Fuel fast cutting plan for thermal power unit during FCB process

    • Thermal Power Generation   Issue 9, (2016)
    • CLC: TK621;TP15
    • Published Online:25 September 2016,

      Published:2016

    移动端阅览

  • SUN Lingfang, LANG Kun, REN He. Fuel fast cutting plan for thermal power unit during FCB process[J]. Thermal power generation, 2016, (9). DOI:

  •  
  •  

0

Views

383

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Control strategy for automatic parallel operation of feed water pumps in a 630 MW coal-fired unit
ANALYSIS OF COMMON PROBLEMS OCCURED IN FIRE-FIGHTING AUTOMATIC CONTROL AND WARNING SYSTEM
STUDY ON AGING PERFORMANCE OF THERMAL POWER UNITS BASED ON HISTORIC DATA
Simulation of fuel control in fast cut back process of thermal power units
Design and implementation of intelligent water island control system for thermal power units

Related Author

WANG Xihui
CHEN Houtao
PENG Shuangjian
FU Qiang
XUN Xin
ZHAN Yuxin
CHEN Yanqiao1
LIU Jianmin2

Related Institution

State Grid Hunan Electric Power Company Research Institute
Hunan Xiangdian Test and Research Institute Co. Ltd.
Hunan Province Key Laboratory of High Efficiency and Clean Thermal Power Technology
Guodian Xuanwei Power Generation Co., Ltd. Yunnan Xuanwei
School of Automation Science and Electrical Engineering, Beihang University
0