您当前的位置:
首页 >
文章列表页 >
Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics
更新时间:2025-09-28
    • Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics

    • Thermal Power Generation   Issue 3, (2016)
    • CLC: P272;TK323
    • Published Online:15 April 2016,

      Published:2016

    移动端阅览

  • MA Liangyu, CHENG Lei. Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics[J]. Thermal power generation, 2016, (3). DOI:

  •  
  •  

0

Views

263

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation on mechanism model of intermediate point temperature for an ultra-supercritical 1000MW unit once-through boiler
Simulation and prediction of deaerator water level for a 1000MW unit under FCB condition
Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Water wall temperature deviation of an ultra-supercritical 1 000 MW unit boiler: analysis and countermeasures
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system

Related Author

YE Xiangqian
WANG Zhenyu
LI Xin
FANG Yanjun
DENG Shaoxiang
HUO Min
HU Niansu
MAO Yijun

Related Institution

Guangdong Power Grid Corporation Electric Power Science Research Institute
School of Power and Mechanical Engineering, Wuhan University
Huaneng Anyuan Power Generation Co., Ltd.
Guodian Taizhou Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
0