您当前的位置:
首页 >
文章列表页 >
Optimization of load control strategy for a supercritical 600MW unit boiler
更新时间:2025-09-28
    • Optimization of load control strategy for a supercritical 600MW unit boiler

    • Thermal Power Generation   Vol. 44, Issue 8, Pages: 113-115(2015)
    • Published:2015

    移动端阅览

  • YANG Ping, GAO Longjun, WANG Xiaogang, et al. Optimization of load control strategy for a supercritical 600MW unit boiler[J]. Thermal power generation, 2015, 44(8): 113-115. DOI:

  •  
  •  

0

Views

302

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

FEED-WATER REGULATION OF SUPERCRITICAL BOILERS
COUNTERMEASURES FOR MAIN STEAM OVERTEMPERATURE OF 600 MW SUPERCRITICAL UNIT DURING TURBINE SPEED-UP
Heat storage coefficient calculation for typical supercritical 660MW unit once-through boilers
Performance test methods for flue gas waste heat utilization improvement project in coal-fired boilers
Cause analysis and countermeasures of high-temperature sulfur corrosion of water wall in an opposed firing boiler

Related Author

MA Kai-zhong Yangzhou Power Generation Co Ltd No.2
HUANG Wei
ZHANG Jian-ling
PENG Min
HUANG Lai
GUO Wei-hua
He Jun-min Hunan Electric Power Test and Research Institute
Changsha 410007

Related Institution

Yangzhou Second Power Generation Co., Ltd
Hunan Electric Power Company Experimental Research Institute
School of Control and Computer Engineering, North China Electric Power University
Ningxia Jingneng Ningdong Power Generation Co., Ltd
College of Energy, Power and Mechanical Engineering, North China Electric Power University
0