PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
更新时间:2025-09-28
    • PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)

    • Thermal Power Generation   Vol. 38, Issue 10, Pages: 68-70(2009)
    • Published:2009

    移动端阅览

  • LI Xiu-juan Heze Power Plant. PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)[J]. Thermal power generation, 2009, 38(10): 68-70. DOI:

  •  
  •  

0

Views

288

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT
EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT
EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS

Related Author

CHANG Shi-ji
CHEN Min
LI De-shi
WANG Zhen
ZHANG Cuihong
LIU Qiang
CHEN Hao
ZHANG Yan-ping

Related Institution

Zhungeer Power Plant Hohhot
Huaneng Yangluo Power Plant
Wuhan University
Shengli Power Plant Dongying
0