APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS
|更新时间:2025-09-28
|
APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS
Thermal Power GenerationVol. 38, Issue 10, Pages: 58-60(2009)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:
Published:2009
稿件说明:
移动端阅览
LIANG Zhao, WU Heng-yun, ZHANG Xiao-bang, et al. APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS[J]. Thermal power generation, 2009, 38(10): 58-60.
DOI:
LIANG Zhao, WU Heng-yun, ZHANG Xiao-bang, et al. APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS[J]. Thermal power generation, 2009, 38(10): 58-60.DOI:
APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS
摘要
结合深圳东部电厂一期3×350MW燃气-蒸汽联合循环机组的自身特点
介绍了该机组APS的设计结构。通过对原APS的中压并汽调节阀控制和锅炉暖管疏水控制的优化
实现了机组一键自动起、停功能。
Abstract
Combined with inherent features of 3×350 MW gas-steam combined cycle units in the first-phase project of Shenzhen Dongbu Power Plant
the designed structure of automatic plant system(APS) for the units has been presented.Through optimizing the control of MP governing valve for bringing steam into line of the original APS
and optimizing the control of drain water from warming pipes in boilers
the function of automatic start-up and shutdown using one key has been realized.