Analysis of sand plug and measures of fracturing of CBM horizontal wells
|更新时间:2025-12-05
|
Analysis of sand plug and measures of fracturing of CBM horizontal wells
Petroleum Reservoir Evaluation and DevelopmentVol. 9, Issue 2, Pages: 80-82(2019)
作者机构:
中国石化华东石油工程有限公司工程技术分公司,江苏,扬州,225000
作者简介:
基金信息:
DOI:
CLC:TE357
Published:2019
稿件说明:
移动端阅览
Zhu He. Analysis of sand plug and measures of fracturing of CBM horizontal wells[J]. Petroleum Reservoir Evaluation and Development, 2019, 9(2): 80-82.
DOI:
Zhu He. Analysis of sand plug and measures of fracturing of CBM horizontal wells[J]. Petroleum Reservoir Evaluation and Development, 2019, 9(2): 80-82.DOI:
Analysis of sand plug and measures of fracturing of CBM horizontal wells
摘要
水平井分段加砂压裂是目前煤层气开发的一种重要方式。结合织金工区压裂施工实例
对煤层气井施工出现砂堵的原因进行剖析
提出了针对性的处理措施
提高了施工成功率
达到降本增效的目的
为织金工区煤层气井开发提供技术保障。
Abstract
Sublevel fracturing with sand of horizontal wells is an important method for the development of CBM. Combined with the fracturing construction examples in Zhijin district
we analyzed the reasons of the sand plug in fracturing and proposed the corresponding measures
thereby
to improve the success rate of the construction and achieve the purpose of reducing the cost and increasing the efficiency. It provided technical guarantee for the development of CBM wells in Zhijin area.