您当前的位置:
首页 >
文章列表页 >
Analysis of a 110 kV Transformer Operation Accident Caused by Failure of On - load Tap Changer
更新时间:2026-02-13
    • Analysis of a 110 kV Transformer Operation Accident Caused by Failure of On - load Tap Changer

    • Vol. 42, Issue 3, Pages: 80-84(2019)
    • CLC: TM41
    • Published:2019

    移动端阅览

  • Huang Xin. Analysis of a 110 kV Transformer Operation Accident Caused by Failure of On - load Tap Changer[J]. 2019, 42(3): 80-84. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

322

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of a 110 kV Transformer Operation Accident Caused by Failure of On - load Tap Changer
Analysis of An Accident Caused by Heavy Gas Misoperation of Oil-flow Relay
Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer
On-site Comprehensive Diagnosis Method of Partial Discharge for Transformer Equipment Based on Ultrasonic Associated with Electromagnetic Wave and Vibration Test
Analysis on an Unqualified Test for Short - Circuit Withstand Ability of 110 kV Transformers and Its Rectification Measures

Related Author

QIU Wei
TAN Wenqiang
Wang Chao
Xie Qian
Zhang Wentao
Wu Bo
张华强
李波

Related Institution

State Grid Chengdu Electric Power Supply Company
State Grid Sichuan Electric Power Company
State Grid Sichuan Electric Power Company
State Grid Sichuan Electric Power Research Insititute
College of Electrical Engineering and Information Technology,Sichuan University
0