您当前的位置:
首页 >
文章列表页 >
Measures for Improving UHVDC Delivery Output in Second Phase of Jinsha River Project
更新时间:2026-02-13
    • Measures for Improving UHVDC Delivery Output in Second Phase of Jinsha River Project

    • Vol. 42, Issue 5, Pages: 56-60(2019)
    • CLC: TM721.1
    • Published:2019

    移动端阅览

  • Chen Hanxiong. Measures for Improving UHVDC Delivery Output in Second Phase of Jinsha River Project[J]. 2019, 42(5): 56-60. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

71

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Measures for Improving UHVDC Delivery Output in Second Phase of Jinsha River Project

Related Author

Wang Yongcan
Shi Peng
Zeng Zhuolin
Li Xin
Qi Fang
Xu Peng
Zhang Qinghui
Deng Mei

Related Institution

State Grid Sichuan Electric Power Research Institute
CGN New Energy Holdings Co., Ltd.
Sate Grid Chengdu Electric Power Supply Company
Guangdong Institute of Urban and Rural Planning and Design
Xijiang Tiandian Dabancheng Wind Power Generation Co. ,Ltd
0