Research on Capacity Allocation and Optimized Operation of Cascaded Hydropower-Photovoltaic-Pumped Hydro Storage Hybrid System Under Multi-scenario
|更新时间:2026-02-13
|
Research on Capacity Allocation and Optimized Operation of Cascaded Hydropower-Photovoltaic-Pumped Hydro Storage Hybrid System Under Multi-scenario
Vol. 44, Issue 2, Pages: 1-7(2021)
作者机构:
中电建水电开发集团有限公司
作者简介:
基金信息:
DOI:
CLC:
Published:2021
稿件说明:
移动端阅览
TANG Jiong. Research on Capacity Allocation and Optimized Operation of Cascaded Hydropower-Photovoltaic-Pumped Hydro Storage Hybrid System Under Multi-scenario[J]. 2021, 44(2): 1-7.
DOI:
TANG Jiong. Research on Capacity Allocation and Optimized Operation of Cascaded Hydropower-Photovoltaic-Pumped Hydro Storage Hybrid System Under Multi-scenario[J]. 2021, 44(2): 1-7.DOI:
Research on Capacity Allocation and Optimized Operation of Cascaded Hydropower-Photovoltaic-Pumped Hydro Storage Hybrid System Under Multi-scenario
Xiaojin county in Sichuan province is high in the northeast and low in the southwest
and is rich in light and water resource
which is conducive to the construction of a cascaded hydropower-photovoltaic-pumped hydro storage (HP-PV-PHS) complementary power plant. However
the HP-PV-PHS capacity ratio greatly affects the complementary benefits. Because PV output fluctuates frequently and the time scale is small
the multi-scenario cascaded HP-PV-PHS capacity allocation and optimized operation under the minutes time scale is proposed. From the view of improving the economic benefits and delivery stability of the complementary system
firstly
a bi-level mathematical model for capacity allocation and optimized operation of a cascaded HP-PV-PHS with minimal investment cost and minimal power fluctuation in delivery is established. Secondly
the method and execution steps of the bi-level programming model based on particle swarm optimization and sequential quadratic programming algorithm (PSO-SQP) are described in detail. Finally
the accuracy and reasonability of the bi-level programming model is analyzed in multiple scenarios. The case study reveals that 5 MW PHS can make the cascaded HP-PV-PHS complementary system have a maximum investment benefit ratio and mitigate the power fluctuation on tie-line by up to 11.7%.