Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer
|更新时间:2026-02-13
|
Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer
Vol. 45, Issue 1, Pages: 91-94(2022)
作者机构:
国网四川省电力公司,
作者简介:
基金信息:
DOI:
CLC:
Published:2022
稿件说明:
移动端阅览
TAN Wenqiang. Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer[J]. 2022, 45(1): 91-94.
DOI:
TAN Wenqiang. Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer[J]. 2022, 45(1): 91-94.DOI:
Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer
According to the regulations of "Code for fire protection design of buildings" (GB 50016-2014)
an automatic fire extinguishing system should be installed for a separate oil-immersed transformer with a capacity of 125 MV·A and above. Some of the old type transformers with 125 MVA and above are not equipped the hole with oil evacuation and nitrogen injection extinguishing device
and there are no holes prepared for oil evacuation and nitrogen injection pipes in advance. In order to solve the problems of the old oil-immersed transformer without interface connected to install the oil evacuation and nitrogen injection extinguishing device
an innovative solution of using transformer manhole
oil discharge valve and sampling valve as connection interface is proposed. Compared with the method of opening new holes in transformers
the proposed method has the advantages of simplicity
convenience and safet
which can greatly shorten the reconstruction time and save the construction cost.
Modification for the Interface of Oil Evacuation and Nitrogen Injection Extinguishing Device in Old Type Transformer
Analysis of An Accident Caused by Heavy Gas Misoperation of Oil-flow Relay
On-site Comprehensive Diagnosis Method of Partial Discharge for Transformer Equipment Based on Ultrasonic Associated with Electromagnetic Wave and Vibration Test
Analysis of a 110 kV Transformer Operation Accident Caused by Failure of On - load Tap Changer
Analysis on an Unqualified Test for Short - Circuit Withstand Ability of 110 kV Transformers and Its Rectification Measures
Related Author
QIU Wei
Wang Chao
Huang Xin
Xie Qian
Zhang Wentao
Wu Bo
张华强
李波
Related Institution
State Grid Chengdu Electric Power Supply Company
State Grid Sichuan Electric Power Company
State Grid Chengdu Electric Power Supply Company
State Grid Sichuan Electric Power Research Insititute
College of Electrical Engineering and Information Technology,Sichuan University