COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT
|更新时间:2025-09-28
|
COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT
Thermal Power GenerationVol. 38, Issue 7, Pages: 83-87(2009)
作者机构:
1. 西安热工研究院有限公司
2. 中国电力出版社
3. 陕西华电蒲城发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK323
Published:2009
稿件说明:
移动端阅览
ZHAO Zhi-dan1, HAO De-feng1, HUANG Xiao-hua2, et al. COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT[J]. Thermal power generation, 2009, 38(7): 83-87.
DOI:
ZHAO Zhi-dan1, HAO De-feng1, HUANG Xiao-hua2, et al. COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT[J]. Thermal power generation, 2009, 38(7): 83-87.DOI:
COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT
This paper introduces the collaborative control strategy on a home-made 300 MW air-cooled circulating fluidized bed unit in North United Power Corporation Mengxi Power Plant of China Huaneng Group.To solve the thermal inertia problem
the wind/fuel amount change feedforward according to load variation and the proportional control of fuel amount feedforward according to coal quality are optimized.Operation results illuminate that the load variation of the unit can reaches to 2% and 4 MW/min
and stable and rapid control of the unit is achieved.